top of page
juan_camarillo.png

Surface:  5000 m2

Project:

•  Basic and execution

•  Facilities

•  Activity

 

Construction Management

•  Installations

•  Electricity (Low, Medium Voltage)

•  lighting

•  Air conditioning

•  Fire Protection (PCI)

 

Medium Voltage:

20,000kVA

 

Generators:

16,000 kVA

 

Uninterruptible power supply (UPS):

4,000 kVA

 

Chillers:

8,000,000 kcal/h

JULIAN CAMARILLO

bottom of page